Integrated Line Management System iLNB
Do you face any of these problems?
- Need changeover automatically
- Need to visualize the entire line
- Need to increase productivity across the line
- Need plan-based production
- Need to consolidate specifications from other companies
Panasonic’s Integrated Line Management System “iLNB” “connects” Panasonic machines, non-Panasonic machines and higher-level systems to solve your problems
▲ Potential “problems” and “Panasonic’s solutions”
Automatic changeover
- Changeover recipe registration and linkage
- Machine control and switching methods for automated changeover
E-Link (information input)
- Automated creation of new production plan and updating
E-Link (information output) operation information
- Collection and external output of operating information for each PCB, such as:
- Loading and unloading time
- Operating time, stop time and error stop time
E-Link (information output) trace information
- Collection and external output of trace information for each PCB, such as:
- Each machine: Loading and unloading time
- Mounting machine: Trace of mounted components
E-Link (information output) machine condition
- Collection and external output of machine event and machine status information, such as:
- Production start event and error occurrence event
- Status during production and changeover, etc.
E-Link (machine control)
- From external systems
- Control production start of machines
- Control transfer of PCBs